Skip to main content
European Commission logo
Energy

Central and South-East European Energy Connectivity

The CESEC High-Level Group coordinates efforts to facilitate cross-border and trans-European energy infrastructure projects and market integration in Central and South-East Europe. 

The High-Level Group for Central and South-East European Energy Connectivity (CESEC) works to accelerate interconnectivity, market integration, the deployment of renewables and the integration of hydrogen and biomethane into networks in the region.

CESEC members

CESEC objective

The High-Level Group was set up in 2015 through the signature of the Memorandum of Understanding on a joint approach to address the natural gas diversification and security of supply challenges as part of the Central and South-Eastern European Gas Connectivity (CESEC) initiative. 

Initially, the main focus of CESEC was to coordinate efforts to facilitate the swift completion of cross-border and trans-European projects that diversified gas supplies to the region, develop regional gas markets and implement harmonised EU rules to ensure the optimal functioning of the energy infrastructure.

In September 2017, energy ministers signed a Memorandum of Understanding (MoU), extending the scope of CESEC cooperation. Since then, its objective also includes cross-border projects to connect the regional electricity systems and a joint approach on electricity markets, as well as renewable energy development.

Strategic guidance and action plans

Beyond the MoU, the cooperation and work is guided by the strategic guidelines of the CESEC Ministers, defined and agreed in Ministerial Conclusions.

The strategic steer of Ministers is translated into concrete deliverables defined in detail in the CESEC action plans: one on electricity and renewable energy and another on gases.

The latest conclusions and action plans were endorsed by the CESEC Ministers on 27 October 2025 in Bucharest, Romania. They reflect the priorities of CESEC across a wide range of areas aimed, among other things, at addressing wholesale electricity price spikes in the region, ensuring the maximised use of existing energy infrastructure and integrating Projects of Energy Community Interest (PECIs). 

Potential for renewable and low-carbon gas deployment

The Commission published a study in July 2024 on the CESEC’s region potential for renewable and low-carbon gas deployment in the context of infrastructure development. It assesses prospects for ramping up renewable and low-carbon hydrogen production and off-take in the 16 CESEC countries. 

It evaluates the availability of reliable and accessible infrastructure and its readiness and technical potential to transport hydrogen. The study also takes stock of the most common technical, safety and economic challenges related to the hydrogen transmission and identifies the main challenges and key actions that the CESEC High-Level Group can take to address the infrastructure and regulatory priorities, bottlenecks and needs for renewable and low-carbon gas integration.

CESEC meetings

The first CESEC High-Level Group meeting took place in February 2015. The most recent CESEC Ministerial meeting took place on 27 October 2025 in Romania. 

All CESEC High-Level Group Ministerial and Plenary Working Group meeting agendas, Ministerial conclusions and other accompanying documents are published and available in chronological order in a dedicated CIRCABC.