Working Group 2 (WG2) explores the challenges and needs that TSOs and DSOs face when investing in transmission and distribution networks. The objective is to ensure that transmission and distribution networks are up-to-date and future-proofed for the different types of energy sources. The discussions touch upon the specifics of financing the infrastructure needed to achieve carbon neutrality, foster decentralised energy production, ensure energy security, and tackle bottlenecks for EU’s LNG capacity.
For more details on what has been discussed in WG2 meetings, see below 'WG2 reports'.
WG2 reports
- Barriers to investments in Transmission and Distribution (September 2022)
- Financing models for Transmission and Distribution (November 2022)
- Availability of financial instruments for Transmission and Distribution (December 2022)
- Guarantees for Transmission and Distribution (January 2023)
- Equity and quasi-equity for Transmission and Distribution (March 2023)
- Green bonds for Transmission and Distribution (May 2023)
- Blended finance and loans for Transmission and Distribution (July 2023)
- Pilot scheme 1: Blended Finance scheme with Technical Assistance
- Pilot scheme 2: Contribution to the EU Grid Action Plan (March 2024)
- Pilot scheme 3: Technical assistance for the Transmission and Distribution sector (May 2024)
Access to the ID-E Members Platform
Only WG Members can access the ID-E Members Platform.